Radon Barrier

The rising walls were built within a week and then radon barrier is put on. This one of the jobs that the self builder can do himself. It is best done with two people and on a day with low wind. Although it is a relatively simple job it requires time and patience. It is a high...
By :
Comments : Off

Footings up

We opened the site June 2013, with excavation works starting on entrance and road up to site as per my landscape design layouts. The topsoil was stripped back and 4 inch stone was laid for the new road to enable site access. The next step was to dig out footings which were extra...
By :
Comments : Off

Foundations poured

At an early stage it was decided to go the self-build route. The client had family members who were involved in the building industry, and a local engineer was engaged to project-manage the building. It was very important for us to achieve an “A” rated home so we looked at all...
By :
Comments : Off
alternative text

Load bearing walls dug out

The main cornerstone of design is 1. the budget 2. site constraints 3. planning law 4. aesthetics. It is with this in mind that we finalised and submitted for planning application. In order to submit the application I also needed to engage an Engineer to do soil test for...
By :
Comments : Off

Entrance work starts

I my experience the most common criteria to look out for when choosing a site are 1. Is it in a historical / archaeological area 2. Are the sightlines to the road achievable to the NRA guidelines, (if not will I be able to take back a ditch / fence to achieve these, sometimes...
By :
Comments : Off